| 1. | Excavation of left - bank flood discharging tunnel at gongbo gorge hydropower station 公伯峡水电站左岸泄洪洞开挖施工 |
| 2. | Analysis of the current flood discharge capacity ofthe panlong river channel in kunming city 昆明盘龙江河道现状行洪能力分析 |
| 3. | Study on hydroenergy dissipation problem of flood discharge structure of the three gorges project 三峡工程泄洪建筑物泄洪消能问题研究 |
| 4. | Application of silicon powder concrete for flood discharge middle outlet in the baojixia reservoir project 硅粉混凝土在宝鸡峡水库泄洪中孔的应用 |
| 5. | Controlled demolition blasting technology for thin reinforced concrete wall of a flood discharging tunnel 泄洪洞钢筋砼高薄边墙切割拆除控制爆破技术 |
| 6. | Application of water damage and reinforcement for base plate of flood discharge trough in spillway of guanzhuang reservoir 官庄水库溢洪道泄槽底板水毁原因分析与加固 |
| 7. | The application and the development of the flood discharge tunnel are reviewed in this dissertation , turbulence mathematical models are also summarized 本文对泄洪洞的应用和发展进行了回顾,对紊流数学模型进行了总结。 |
| 8. | As a kind of important hydraulic structure , hydraulic tunnel is very useful at many aspects such as conveyance , diversion and flood discharge 水工隧洞作为一种重要的水工建筑物,在输水、导流及泄洪等方面起着重要的作用。 |
| 9. | A flood peak cut coefficient ( ) is proposed to measure the affection of the flood hydrograph for the risk calculating of the flood discharge 本文分析了洪水过程这一不确定性因素,并用洪峰削减系数将洪水过程的不确定性量化。 |
| 10. | In this paper , those uncertain factors affecting the flood discharge are discussed , especially the uncertainty of flood hydrograph 本文全面考虑了影响施工导流及泄洪风险的不确定性因素,重点分析了洪水过程的不确定性对施工导流及泄洪风险的影响。 |